Dr Nick

(3)

$14/per page/Negotiable

About Dr Nick

Levels Tought:
Elementary,Middle School,High School,College,University,PHD

Expertise:
Art & Design,Computer Science See all
Art & Design,Computer Science,Engineering,Information Systems,Programming Hide all
Teaching Since: May 2017
Last Sign in: 247 Weeks Ago, 2 Days Ago
Questions Answered: 19234
Tutorials Posted: 19224

Education

  • MBA (IT), PHD
    Kaplan University
    Apr-2009 - Mar-2014

Experience

  • Professor
    University of Santo Tomas
    Aug-2006 - Present

Category > Geology Posted 12 Sep 2017 My Price 14.00

Individual: Project Proposal Week 1

 

Consider the following scenario:

You have been hired by a large company with branch offices around the country to assist with rollout of a new companywide compliance system.

While initially the focus was on implementation of the technology, it was found that success will require at least 10 hours of training over two days for all managers across the country on both the use of the new platform as well as a host of new compliance policies being introduced.

Of the options discussed, it was generally agreed that the training should be hands-on and conducted in-person at a central location. This will obviously require getting organizational buy-in as not all managers are going to be willing to commit to taking time out from their normal responsibilities just for some training.

In addition, such large scale centralized training has not been done before by this company; therefore, the CEO wants feedback from participants to evaluate the effectiveness of any training sessions.

As a result, your manager has given you the responsibility to develop an outline for a proposed project that would meet this upcoming need for arranging and conducting a two-day training session.

This scenario will continue throughout the first three weeks with all weeks being submitted along with the Week 3 assignment. You are expected to apply any feedback provided by the instructor to these finalized documents.

Submit a 2- to 3-page memo that includes the following:

  • Names the project
  • Briefly describes the project
  • Identifies potential stakeholders directly or indirectly involved
  • Specifies the overall objective and any outcomes for this project
  • Details how success will be evaluated
  • Highlights what is needed to ascertain the Measurable Organizational Value (MOV) of this project.

You will need to make some assumptions (it is even encouraged), but the assumptions must be documented.

Answers

(3)
Status NEW Posted 12 Sep 2017 01:09 PM My Price 14.00

Hel-----------lo -----------Sir-----------/Ma-----------dam-----------Tha-----------nk -----------you----------- fo-----------r v-----------isi-----------tin-----------g o-----------ur -----------web-----------sit-----------e a-----------nd -----------acq-----------uis-----------iti-----------on -----------of -----------my -----------pos-----------ted----------- so-----------lut-----------ion----------- pl-----------eas-----------e p-----------ing----------- me----------- on----------- ch-----------at -----------I a-----------m o-----------nli-----------ne -----------or -----------inb-----------ox -----------me -----------a m-----------ess-----------age----------- I -----------wil-----------l

Not Rated(0)