SmartExpert

(118)

$30/per page/Negotiable

About SmartExpert

Levels Tought:
Elementary,Middle School,High School,College,University,PHD

Expertise:
Accounting,Business & Finance See all
Accounting,Business & Finance,Economics,English,HR Management,Math Hide all
Teaching Since: Apr 2017
Last Sign in: 7 Weeks Ago, 6 Days Ago
Questions Answered: 7559
Tutorials Posted: 7341

Education

  • BS,MBA, PHD
    Adelphi University/Devry
    Apr-2000 - Mar-2005

Experience

  • HOD ,Professor
    Adelphi University
    Sep-2007 - Apr-2017

Category > Business & Finance Posted 14 May 2017 My Price 10.00

MBA 6961 Unit VI Project Answer

Unit VI Project

This assignment consists of four parts. Please label each part of the assignment Part 1, Part 2, Part 3, and Part 4 in the document, and insert a page break after each part. Click here to see an example. The total assignment is worth 100 points. Please submit as one document.

Note: This assignment requires the use of MS Project or similar software. If you do not have MS Project or similar software, you may look for free or trial versions on the Internet.

Part 1: Develop an in-depth schedule for your initial project based on the Work Breakdown Structure you completed in Unit III. Please refer to the Integrated Project in Chapter 10 of the textbook on page 318 for more information. (40 points total)

Be sure to include:

1. An activity precedence diagram (10 points)

2. An activity duration table (10 points)

3. A network diagram and Gantt charts (20 points)

Part 2: Please complete Case Study 10.2, "Project Scheduling at Blanque Check Construction" on pages 315 and 316 in the textbook and respond to the questions for discussion. Please make sure that each question is answered thoroughly using a minimum of 200 words for each case study question. (10 points)

Part 3: Develop the network activity chart and identify the critical path for a project based on the information provided in the Gantt Chart Activity document. To access the Gantt chart activity document, click here. (25 points total)

1. Draw the activity network as a Gantt chart. (20 points)

2. What is the expected duration of the project? (5 points)

Part 4: Consider the project with the information provided in the Project Activity Network document. To access the Project Activity document, click here or on the link above. (25 points total)

1. Construct the project activity network using AON methodology and label each node. (15 points)

2. Identify the critical path and other paths through the network. (10 points)

 

Information about accessing the Blackboard Grading Rubric for this assignment is provided below. MBA 6961, Project Management 4

Answers

(118)
Status NEW Posted 14 May 2017 07:05 PM My Price 10.00

-----------

Attachments

file 1494791133-MBA 6961 Unit VI Project Answer.docx preview (725 words )
----------- ----------- ----------- ----------- ----------- ----------- ----------- ----------- ----------- ----------- ----------- ----------- ----------- ----------- ----------- ----------- ----------- ----------- M-----------BA -----------696-----------1 U-----------nit----------- VI----------- Pr-----------oje-----------ct ----------- Pr-----------ofe-----------sso-----------r -----------Nam-----------e -----------Dat-----------e -----------Par-----------t 1-----------: ----------- De-----------vel-----------op -----------an -----------in------------dep-----------th -----------sch-----------edu-----------le -----------for----------- yo-----------ur -----------ini-----------tia-----------l p-----------roj-----------ect----------- ba-----------sed----------- on----------- th-----------e W-----------ork----------- Br-----------eak-----------dow-----------n S-----------tru-----------ctu-----------re -----------you----------- co-----------mpl-----------ete-----------d i-----------n U-----------nit----------- II-----------I. -----------Ple-----------ase----------- re-----------fer----------- to----------- th-----------e I-----------nte-----------gra-----------ted----------- Pr-----------oje-----------ct -----------in -----------Cha-----------pte-----------r 1-----------0 o-----------f t-----------he -----------tex-----------tbo-----------ok -----------on -----------pag-----------e 3-----------18 -----------for----------- mo-----------re -----------inf-----------orm-----------ati-----------on.----------- (4-----------0 p-----------oin-----------ts -----------tot-----------al)----------- B-----------e s-----------ure----------- to----------- in-----------clu-----------de:----------- 1-----------. A-----------n a-----------cti-----------vit-----------y p-----------rec-----------ede-----------nce----------- di-----------agr-----------am -----------(10----------- po-----------int-----------s) ----------- 2.----------- An----------- ac-----------tiv-----------ity-----------
Not Rated(0)