CourseLover

(12)

$10/per page/Negotiable

About CourseLover

Levels Tought:
Elementary,Middle School,High School,College,University,PHD

Expertise:
Algebra,Applied Sciences See all
Algebra,Applied Sciences,Architecture and Design,Art & Design,Biology,Business & Finance,Calculus,Chemistry,Engineering,Health & Medical,HR Management,Law,Marketing,Math,Physics,Psychology,Programming,Science Hide all
Teaching Since: May 2017
Last Sign in: 283 Weeks Ago
Questions Answered: 27237
Tutorials Posted: 27372

Education

  • MCS,MBA(IT), Pursuing PHD
    Devry University
    Sep-2004 - Aug-2010

Experience

  • Assistant Financial Analyst
    NatSteel Holdings Pte Ltd
    Aug-2007 - Jul-2017

Category > Computer Science Posted 25 Dec 2017 My Price 10.00

ICT 377 FINAL PROJECT Technical expectations

Using Cisco Packet Tracer, please create the following doing all section but the grading part which is information for myself. Please submit pkt file, memo.

for the Configuration for enable secrets and console and vty 0 4 passwords will be final7

ICT 377 FINAL PROJECT Technical expectations In this project, you are to create a working network following a given topology and configuration requirements for switches, routers, PCs, and one server. You are not provided an address table, you will be working with one starting IP address, creating your own subnets and assigning IP addresses according to provided requirements; similar, but more elaborate than exam 2. This project entails application of material covered this semester such as addressing, basic switch and router configurations, inter-LAN communication, plus research and application of further topics such as: inter-VLAN communication (you’ll needed it within the Purple network). HINT: Some keywords/phrases to search for are “router on a stick”, encapsulation 802.1q, router sub-interfaces, and backing up switches’ and routers’ configurations on to the server using TFTP (expected to back up both routers and switches configurations). – (not required, but 15 pt extra credit, all or nothing type of credit) IPv4 Addressing 1) Choose a private class B IP address and subnet it into two equal sized subnets of 128 total hosts (each). o Use the first of the two subnets is to be used for the orange network. o Then, VLSM the second of the two subnets to accommodate the following: (1) Point to Point network (2) Each of the VLANs in the purple network. Ensure you have enough usable IP addresses to meet future number of usable hosts. You should only waste the least possible amount of host addresses. Purple Network VLAN information VLAN ID/Name Current # of usable hosts Expected future # usable hosts VLAN 10/Admin 4 6 VLAN 12/Faculty 3 8 VLAN 35/Student 14 35 VLAN 88/ ICTMgt 2 4 VLAN 99/Native N/A N/A NOTE:OnlyneedtoconfiguretwoPCsperswitch,perVLAN
Background image of page 1

Attachments:

Answers

(12)
Status NEW Posted 25 Dec 2017 12:12 PM My Price 10.00

-----------  ----------- H-----------ell-----------o S-----------ir/-----------Mad-----------am ----------- Th-----------ank----------- yo-----------u f-----------or -----------usi-----------ng -----------our----------- we-----------bsi-----------te -----------and----------- ac-----------qui-----------sit-----------ion----------- of----------- my----------- po-----------ste-----------d s-----------olu-----------tio-----------ns.----------- Pl-----------eas-----------e p-----------ing----------- me----------- on----------- ch-----------at -----------I a-----------m o-----------nli-----------ne -----------or -----------inb-----------ox -----------me -----------a m-----------ess-----------age-----------

Not Rated(0)