Levels Tought:
Elementary,Middle School,High School,College,University,PHD
Teaching Since: | Apr 2017 |
Last Sign in: | 10 Weeks Ago |
Questions Answered: | 4870 |
Tutorials Posted: | 4863 |
MBA IT, Mater in Science and Technology
Devry
Jul-1996 - Jul-2000
Professor
Devry University
Mar-2010 - Oct-2016
NT1310. I have come to the conclusion that I have no way of completing this project by the 30th. I have included the entire project in the attachment and am looking for some help. If there is anything available, please do not hesitate to let me know.
Â
NT1310: ProjectPage 1PROJECT DESCRIPTIONAs the project manager for the Cable Planning team, you will manage the creation of the cable plan forthe new building that will be built, with construction set to begin in six weeks.The deliverables for the entire Cable Plan will consist of an Executive Summary, a PowerPointPresentation and an Excel Spreadsheet. You will develop different parts of each of these in three parts.The final organization should contain these elements:The Executive Summary:oProject IntroductionoStandards and CodesCable Standards and CodesBuilding Standards and CodesoProject MaterialsoCopper Cable, Tools, and Test EquipmentoFiber-Optic Cable, Tools, and Test EquipmentoFiber-Optic Design ConsiderationsoBasement Server Complex DesignoFirst Floor DesignoSecurity and SafetyoComponent Cost, Picture, and sourceThe Excel Spreadsheet:Component NamesComponent DescriptionsComponent CostsTotal Project CostsThe PowerPoint Presentation:Introductory SlideComponent Slides with Component Name, Quantity Needed, Description, Price, Picture, andReference (where to buy the component)Description of the Basement Telecommunications and Network Server SpaceNetwork Equipment Required for the Server FarmCable Plant Design for the Basement
Attachments:-----------