The world’s Largest Sharp Brain Virtual Experts Marketplace Just a click Away
Levels Tought:
Elementary,Middle School,High School,College,University,PHD
| Teaching Since: | Apr 2017 |
| Last Sign in: | 419 Weeks Ago, 3 Days Ago |
| Questions Answered: | 3232 |
| Tutorials Posted: | 3232 |
MBA,MCS,M.phil
Devry University
Jan-2008 - Jan-2011
MBA,MCS,M.Phil
Devry University
Feb-2000 - Jan-2004
Regional Manager
Abercrombie & Fitch.
Mar-2005 - Nov-2010
Regional Manager
Abercrombie & Fitch.
Jan-2005 - Jan-2008
High Lift Construction Co. has determined that the heaviest load to be lifted on a project they anticipate bidding weighs 14,000 lb. From the proposed tower crane location on the building site, the required reach for this lift will be 150 ft. The crane will be equipped with an L5 jib and a two-part hoist line (see the Table 17.3 load chart). This critical lift is of a piece of limestone facing and will require a 2,000-lb spreader bar attached to a 300-lb set of slings. If assembled in the proposed configuration, can the crane safely make the pick? (17,600 lb capacity> 17,1151b load. Therefore, the crane can safely make the pick.)

Â
Â
Hel-----------lo -----------Sir-----------/Ma-----------dam----------- T-----------han-----------k Y-----------ou -----------for----------- us-----------ing----------- ou-----------r w-----------ebs-----------ite----------- an-----------d a-----------cqu-----------isi-----------tio-----------n o-----------f m-----------y p-----------ost-----------ed -----------sol-----------uti-----------on.----------- Pl-----------eas-----------e p-----------ing----------- me----------- on----------- ch-----------at -----------I a-----------m o-----------nli-----------ne -----------or -----------inb-----------ox -----------me -----------a m-----------ess-----------age----------- I -----------wil-----------l