The world’s Largest Sharp Brain Virtual Experts Marketplace Just a click Away
Levels Tought:
Elementary,High School,College,University,PHD
| Teaching Since: | May 2017 |
| Last Sign in: | 356 Weeks Ago, 3 Days Ago |
| Questions Answered: | 20103 |
| Tutorials Posted: | 20155 |
MBA, PHD
Phoniex
Jul-2007 - Jun-2012
Corportae Manager
ChevronTexaco Corporation
Feb-2009 - Nov-2016
Question description
Â
Â
Â
Â
Below is the scenario for the course project assignment. You are assuming the role of the project manager for a company (you select the name) to provide a new product (Backpack with built in refrigerated pouch and radio module) to a customer (Â U.S. Army, Ground Forces and Special Operations). Each week you will be presented additional information on the project and will be required to produce a weekly deliverable in support of the project.
The course project is designed to address the course objective as well as incorporate each of the weekly modules objectives. You will be required to submit a final paper on the project addressing all of the objectives described in the project summary.
Your company was recently awarded a delivery contract on a new product (see below). You were newly hired by the company; you will assume the role as the assigned program manager overseeing the design, development, production and delivery of the new product. The details below provide a summary to the course project:
Expected Result from Senior Management:
Your final project is due in Module 06. There will be individual assignments along the way. The module they are due is noted in the time line below.
|
Module |
Assignment |
|
01 |
Memo to Executive Staff |
|
02 |
Identify Overall Scope and Analyze Unexpected Events |
|
03 |
Statement of Work (SOW) and Work Breakdown Structure (WBS) |
|
04 |
Quantify, Qualify, and Evaluate Project Risks |
|
05 |
Finalize Project Schedule and Mitigate Any Delays |
|
06 |
Prepare a Final Project Report |
Â
The final report due in Module 06 will be 8-10 pages in length. Included in the final project report will be the following:
ASSIGNMENT
Project Scope Document
This assignment has two parts. In the FIRST part of this assignment, you will use the Project Scope Document template (linked below). In the SECOND part of this assignment, you will use Tab 2 of the Project Schedule Template (also linked below). Tab 2 will provide you with the unexpected events information needed to complete your analysis.
Part I
Develop the project scope document (no more than 3 pages long) to include the following information:
Please use the template linked below to develop your project scope document.
Project Scope Document Template
The Project Scope needs to be developed prior to any analysis of unexpected events.
Analysis of Unexpected Events
Part 2
In a separate Word document, provide an analysis of unexpected events using the Project Schedule Template below (the unexpected events are located in Tab 2 of the document). In your analysis, you should discuss four areas affected by these unexpected events. Three of the areas of the project affected by the events should include changes to budget, human capital, and impact to schedule. Identify one additional area affected by these events.
Please submit your assignments in one zip file.
Â
Hel-----------lo -----------Sir-----------/Ma-----------dam----------- T-----------han-----------k Y-----------ou -----------for----------- us-----------ing----------- ou-----------r w-----------ebs-----------ite----------- an-----------d a-----------cqu-----------isi-----------tio-----------n o-----------f m-----------y p-----------ost-----------ed -----------sol-----------uti-----------on.----------- Pl-----------eas-----------e p-----------ing----------- me----------- on----------- ch-----------at -----------I a-----------m o-----------nli-----------ne -----------or -----------inb-----------ox -----------me -----------a m-----------ess-----------age----------- I -----------wil-----------l