SmartExpert

(118)

$30/per page/Negotiable

About SmartExpert

Levels Tought:
Elementary,Middle School,High School,College,University,PHD

Expertise:
Accounting,Business & Finance See all
Accounting,Business & Finance,Economics,English,HR Management,Math Hide all
Teaching Since: Apr 2017
Last Sign in: 57 Weeks Ago, 1 Day Ago
Questions Answered: 7570
Tutorials Posted: 7352

Education

  • BS,MBA, PHD
    Adelphi University/Devry
    Apr-2000 - Mar-2005

Experience

  • HOD ,Professor
    Adelphi University
    Sep-2007 - Apr-2017

Category > Business & Finance Posted 02 Jun 2017 My Price 8.00

Module 2 Assignment 2 Manufacturing Overhead Borealis Manufacturing

Borealis Manufacturing has just completed a major change in its quality control (QC) process. Previously, products had been reviewed by QC inspectors at the end of each major process, and the company's 10 QC inspectors were charged to the operation or job as direct labor. In an effort to improve efficiency and quality, a computerized video QC system was purchased for $250,000. The system consists of a minicomputer, fifteen video cameras, and other peripheral hardware and software. The new system uses cameras stationed by QC engineers at key points in the production process. Each time an operation changes or there is a new operation, the cameras are moved, and a new master picture is loaded into the computer by a QC engineer. The camera takes pictures of the units in process, and the computer compares them to the picture of a “good” unit. Any differences are sent to a QC engineer, who removes the bad units and discusses the flaws with the production supervisors. The new system has replaced the 10 QC inspectors with two QC engineers.

The operating costs of the new QC system, including the salaries of the QC engineers, have been included as factory overhead in calculating the company's plant-wide manufacturing-overhead rate, which is based on direct-labor dollars. The company's president is confused. His vice president of production has told him how efficient the new system is. Yet there is a large increase in the overhead rate. The computation of the rate before and after automation is as follows:

  Before After
Budgeted Manufacturing Overhead 1,900,000 2,100,000
Budgeted Direct Labor Cost 1,000,000 700,000
Budgeted Overhead Rate 190% 300%

“Three hundred percent,” lamented the president. “How can we compete with such a high overhead rate?”

Using the module readings and the Argosy University online library resources, research manufacturing overhead.

Review the situation. Complete the following:

  • Define “manufacturing overhead,” and:
    • Cite three examples of typical costs that would be included in manufacturing overhead.
    • Explain why companies develop predetermined overhead rates.
  • Explain why the increase in the overhead rate should not have a negative financial impact on Borealis Manufacturing.
  • Explain how Borealis Manufacturing could change its overhead application system to eliminate confusion over product costs.
  • Describe how an activity-based costing system might benefit Borealis Manufacturing.

Write a 3–4-pages paper in Word format. Apply APA standards to citation of sources. Use the following file naming convention: LastnameFirstInitial_M2_A2.doc.

 

Assignment 2 Grading Criteria
Maximum Points
Defined manufacturing overhead giving three examples of typical costs that would be included in manufacturing overhead.
16
Explained why companies develop predetermined overhead rates.
16
Explained why the increase in the overhead rate should not have a negative financial impact on Borealis Manufacturing.
16
Explained how Borealis Manufacturing could change its overhead application system to eliminate confusion over product costs.
20
Explained how an activity-based costing system might benefit Borealis Manufacturing.
16
Wrote in a clear, concise, and organized manner; demonstrated ethical scholarship in accurate representation and attribution of sources; and displayed accurate spelling, grammar, and punctuation.
16
Total:

Answers

(118)
Status NEW Posted 02 Jun 2017 10:06 AM My Price 8.00

Mod-----------ule----------- 2 -----------Ass-----------ign-----------men-----------t 2----------- Ma-----------nuf-----------act-----------uri-----------ng -----------Ove-----------rhe-----------ad -----------Bor-----------eal-----------is -----------Man-----------ufa-----------ctu-----------rin-----------g-----------

Attachments

file 1496398768-Module 2 Assignment 2 Manufacturing Overhead Borealis Manufacturing.docx preview (975 words )
----------- ----------- ----------- ----------- ----------- ----------- M-----------odu-----------le -----------2 A-----------ssi-----------gnm-----------ent----------- 2 -----------Man-----------ufa-----------ctu-----------rin-----------g O-----------ver-----------hea-----------d B-----------ore-----------ali-----------s M-----------anu-----------fac-----------tur-----------ing-----------Pro-----------fes-----------sor----------- N-----------ame----------- D-----------ate----------- B-----------ore-----------ali-----------s M-----------anu-----------fac-----------tur-----------ing----------- B-----------ore-----------ali-----------s M-----------anu-----------fac-----------tur-----------ing----------- ha-----------s j-----------ust----------- co-----------mpl-----------ete-----------d a----------- ma-----------jor----------- ch-----------ang-----------e i-----------n i-----------ts -----------qua-----------lit-----------y c-----------ont-----------rol----------- (Q-----------C) -----------pro-----------ces-----------s. -----------Pre-----------vio-----------usl-----------y, -----------pro-----------duc-----------ts -----------had----------- be-----------en -----------rev-----------iew-----------ed -----------by -----------QC -----------ins-----------pec-----------tor-----------s a-----------t t-----------he -----------end----------- of----------- ea-----------ch -----------maj-----------or -----------pro-----------ces-----------s, -----------and----------- th-----------e c-----------omp-----------any-----------'s -----------10 -----------QC -----------ins-----------pec-----------tor-----------s w-----------ere----------- ch-----------arg-----------ed -----------to -----------the----------- op-----------era-----------tio-----------n o-----------r j-----------ob -----------as -----------dir-----------ect----------- la-----------bor-----------. I-----------n a-----------n e-----------ffo-----------rt -----------to -----------imp-----------rov-----------e e-----------ffi-----------cie-----------ncy-----------
Not Rated(0)