The world’s Largest Sharp Brain Virtual Experts Marketplace Just a click Away
Levels Tought:
Elementary,Middle School,High School,College,University,PHD
| Teaching Since: | Apr 2017 |
| Last Sign in: | 451 Weeks Ago, 6 Days Ago |
| Questions Answered: | 3232 |
| Tutorials Posted: | 3232 |
MBA,MCS,M.phil
Devry University
Jan-2008 - Jan-2011
MBA,MCS,M.Phil
Devry University
Feb-2000 - Jan-2004
Regional Manager
Abercrombie & Fitch.
Mar-2005 - Nov-2010
Regional Manager
Abercrombie & Fitch.
Jan-2005 - Jan-2008
5. A pl•rt of a major plant renovation prqjcct, the industrial. engineering department has been asked to balance a revised assembly operation to achieve an output of 960 units per eight-hour day. Task times and precedence relationships are as follows:
|
Task |
Duration Precedes (minutes) task
0.2 b 0 4 0.2 0.4 e 1.2 g 12 g 1.0 end |
|
a b c d e I g |
Do each of the following:
a . Draw the precedence diagram.
b. Determ ine the maximum cycle time.
c. Determine the mi nimum number of stations needed.
d. Assign tasks m workstations on the basis of g,-eatest number of following t:isks. Use longest processing timt' as a tiebreaker. If ties sti ll exist, assume i ndifference in choice.
e. Comput the percenrage of idle time for the assignment in part d
Hel-----------lo -----------Sir-----------/Ma-----------dam----------- T-----------han-----------k Y-----------ou -----------for----------- us-----------ing----------- ou-----------r w-----------ebs-----------ite----------- an-----------d a-----------cqu-----------isi-----------tio-----------n o-----------f m-----------y p-----------ost-----------ed -----------sol-----------uti-----------on.----------- Pl-----------eas-----------e p-----------ing----------- me----------- on----------- ch-----------at -----------I a-----------m o-----------nli-----------ne -----------or -----------inb-----------ox -----------me -----------a m-----------ess-----------age----------- I -----------wil-----------l