The world’s Largest Sharp Brain Virtual Experts Marketplace Just a click Away
Levels Tought:
Elementary,Middle School,High School,College,University,PHD
| Teaching Since: | Apr 2017 |
| Last Sign in: | 419 Weeks Ago |
| Questions Answered: | 3232 |
| Tutorials Posted: | 3232 |
MBA,MCS,M.phil
Devry University
Jan-2008 - Jan-2011
MBA,MCS,M.Phil
Devry University
Feb-2000 - Jan-2004
Regional Manager
Abercrombie & Fitch.
Mar-2005 - Nov-2010
Regional Manager
Abercrombie & Fitch.
Jan-2005 - Jan-2008
A hydraulic shovel will be used to excavate sandy clay and load it into I2-BCY (9.2-BCM) dump trucks. The shovel's production at 100% efficiency is estimated to be 300 BCY/b (229 BCM/I), and job efficiency is 0.80. Truck travel time is estimated to be 8.0 min, and truck fixed-cycle time (excluding loading) is estimated to be 2.0 min. Equipment costs for the shovel and trucks are $40/h and 520/h. respectively.
a. How many trucks are theoretically required to obtain maximum production?
b. What is the expected production of the system in bank measure using this number of trucks?
c. What is the expected unit loading and hauling cost ($/BCY or WBCM)?
Â
Hel-----------lo -----------Sir-----------/Ma-----------dam----------- T-----------han-----------k Y-----------ou -----------for----------- us-----------ing----------- ou-----------r w-----------ebs-----------ite----------- an-----------d a-----------cqu-----------isi-----------tio-----------n o-----------f m-----------y p-----------ost-----------ed -----------sol-----------uti-----------on.----------- Pl-----------eas-----------e p-----------ing----------- me----------- on----------- ch-----------at -----------I a-----------m o-----------nli-----------ne -----------or -----------inb-----------ox -----------me -----------a m-----------ess-----------age----------- I -----------wil-----------l