QuickHelper

(10)

$20/per page/

About QuickHelper

Levels Tought:
Elementary,High School,College,University,PHD

Expertise:
Accounting,Applied Sciences See all
Accounting,Applied Sciences,Business & Finance,Chemistry,Engineering,Health & Medical Hide all
Teaching Since: May 2017
Last Sign in: 356 Weeks Ago, 6 Days Ago
Questions Answered: 20103
Tutorials Posted: 20155

Education

  • MBA, PHD
    Phoniex
    Jul-2007 - Jun-2012

Experience

  • Corportae Manager
    ChevronTexaco Corporation
    Feb-2009 - Nov-2016

Category > Accounting Posted 14 Jun 2017 My Price 10.00

BSOP 326 Case Study 2

Question description

 

 

This case study looks at the behavior of a circuit board process through the use of control charts. At least two control charts will need to be constructed, and from them you will be asked to provide an assessment of what you see. 

Problem Statement
Fujiyama Electronics, Inc. has had difficulties with circuit boards purchased from an outside supplier. Unacceptable variability occurs between two drilled holes that are supposed to be 5 cm apart on the circuit boards. Thirty samples of four boards each were taken from shipments from the supplier as shown in the data from the worksheet below. Data in the worksheet below can also be accessed in Doc Sharing in a file named Fujiyama Electronics Sample Data. 

Fujiyama Electronics
Observations
Sample 1 2 3 4
1 4.92 4.26 4.94 4.29
2 4.65 5.54 5 5.42
3 5.77 5.26 4.76 4.79
4 6.25 4.88 5.66 4.44
5 5.27 5.41 6.02 4.91
6 5.22 5.38 5.08 4.65
7 5.47 4.68 4.56 4.7
8 5.71 4.54 4.17 4.87
9 5.24 5.58 4.72 5.41
10 4.42 5.18 4.79 4.73
11 5.14 4.26 4.71 5.48
12 4.92 5.78 5.5 5.05
13 5.79 3.83 4.3 4.78
14 4.92 4.8 4.75 5.59
15 5.68 5.74 4.65 5.2
16 5.43 4.81 5.27 4.96
17 4.79 6.04 4.47 5.18
18 4.43 5.08 3.69 6.43
19 6.35 5.95 6.29 5.89
20 5.03 4.66 5.25 4.46
21 6.32 6.09 5.57 5.91
22 4.3 5.47 4.27 4.34
23 6.07 4.97 5.51 5.02
24 5.11 4.9 5.91 4.66
25 4.5 5.24 4.86 4.35
26 4.91 4.79 5.74 5.03
27 4.65 4.71 4.81 5.32
28 4.7 5.5 6.04 4.3
29 5.87 5.3 5.78 5.07
30 4.41 4.75 4.95 5.11

 



    The student will complete and/or answer the following questions:

Calculate X-Bar-Bar, R-Bar, and associated control limits using the data in the table above. Create X-Bar•R (Average & Range) Control Charts from the data in the table above. Discuss notable out-of-control conditions displayed in the completed X-Bar•R (Average & Range) Control Charts. Only consider points outside the control limits. Do not consider runs, set of points within certain zones, and so forth. If the conditions you note could be defined as assignable conditions, and they are removed from the process, then what will happen to the X-Bar•R Control Chart? Remove the data related to the out-of-control points you observed from the original data, and recalculate new X-Bar-Bar, R-Bar, and associated control limits. Create new X-Bar•R (Average & Range) Control Charts from your updated data. Discuss how the two sets of Control Charts are different. What has changed? 

Answers

(10)
Status NEW Posted 14 Jun 2017 08:06 PM My Price 10.00

Hel-----------lo -----------Sir-----------/Ma-----------dam----------- T-----------han-----------k Y-----------ou -----------for----------- us-----------ing----------- ou-----------r w-----------ebs-----------ite----------- an-----------d a-----------cqu-----------isi-----------tio-----------n o-----------f m-----------y p-----------ost-----------ed -----------sol-----------uti-----------on.----------- Pl-----------eas-----------e p-----------ing----------- me----------- on----------- ch-----------at -----------I a-----------m o-----------nli-----------ne -----------or -----------inb-----------ox -----------me -----------a m-----------ess-----------age----------- I -----------wil-----------l

Not Rated(0)