ComputerScienceExpert

(11)

$18/per page/

About ComputerScienceExpert

Levels Tought:
Elementary,Middle School,High School,College,University,PHD

Expertise:
Applied Sciences,Calculus See all
Applied Sciences,Calculus,Chemistry,Computer Science,Environmental science,Information Systems,Science Hide all
Teaching Since: Apr 2017
Last Sign in: 103 Weeks Ago, 3 Days Ago
Questions Answered: 4870
Tutorials Posted: 4863

Education

  • MBA IT, Mater in Science and Technology
    Devry
    Jul-1996 - Jul-2000

Experience

  • Professor
    Devry University
    Mar-2010 - Oct-2016

Category > Programming Posted 05 May 2017 My Price 9.00

Business Requirements Document

CIS 498 ---   attached you will find Gannt chart from Project Deliverable 1 already.

Section 1: Business Requirements Document

1. Write an eight to ten (8-10) page original business requirements document for the project plan using the template provided. Note: The template can be found in the Student Center of the online course shell.

a. Describe the project including the following:

i. Describe the scope and analyze how to control the scope.

ii. Identify possible risks, constraints, and assumptions.

iii. Describe the integration with other systems and infrastructure. Note: Database and interface design, security, and networking should be considered.

iv. Define relevant terms that will be used throughout project.

b. Use at least two (2) quality resources in this assignment. Note: Wikipedia and similar Websites do not qualify as quality resources.

Your assignment must follow these formatting requirements:

  • Be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides; citations and references must follow APA or school-specific format. Check with your professor for any additional instructions.
  • Include a cover page containing the title of the assignment, the student’s name, the professor’s name, the course title, and the date. The cover page and the reference page are not included in the required assignment page length.

 

Section 2: Revised Gantt Chart / Project Plan

Use Microsoft Project or an open source alternative, such as Open Project, to:

2. Update the Gantt chart or project plan (summary and detail) template, from Project Deliverable 1: Project Plan Inception, with all the project tasks.