ComputerScienceExpert

(11)

$18/per page/

About ComputerScienceExpert

Levels Tought:
Elementary,Middle School,High School,College,University,PHD

Expertise:
Applied Sciences,Calculus See all
Applied Sciences,Calculus,Chemistry,Computer Science,Environmental science,Information Systems,Science Hide all
Teaching Since: Apr 2017
Last Sign in: 103 Weeks Ago, 2 Days Ago
Questions Answered: 4870
Tutorials Posted: 4863

Education

  • MBA IT, Mater in Science and Technology
    Devry
    Jul-1996 - Jul-2000

Experience

  • Professor
    Devry University
    Mar-2010 - Oct-2016

Category > Programming Posted 05 May 2017 My Price 9.00

mastered basic spreadsheet techniques

please complete project 1 to 9 and attached in the excel 2016 

 

Complete these projects to see how well you’ve mastered basic spreadsheet techniques. For each one, type your name in cell A1, your class in cell A2, the project number in cell F1, and the date in cell F2. Do not change column widths for these four labels, but allow the longer labels to spill over into the next cell. Project 1Class Grades I: Create a class report with headings and columns of proper width for STUDENT NAME, TEST 1, TEST 2, TEST 3, and AVERAGE. Type six names into the worksheet, with three test scores each. Have the spreadsheet automatically calcu- late and display in the AVERAGE column the average of the three scores for each student. Format all numbers to show no decimals. Save the workbook as SHEET1 and print it. Project 2Class Grades II: Open SHEET1. Add four names to the list of six and three test scores for each new name. Copy the average formula so that all students show aver- ages. Create a class average row along the bottom. Have theworksheet calculate and dis- play the average for each test column and an overall average in the average column. For- mat the average column (not row) toshow one decimal. Save the workbook as SHEET2 and print it. Project 3Class Grades III: Open SHEET2. Delete the second student row. Create a bar chart that displays each student’s name and overall average. Add titles. Label the sheet tabs appropriately. Save the workbook as SHEET3. Print the chart only. EXCEL 2010 E-69FIGURE E-66The Show Group Click here 

Attachments:

Answers

(11)
Status NEW Posted 05 May 2017 05:05 AM My Price 9.00

-----------

Not Rated(0)