The world’s Largest Sharp Brain Virtual Experts Marketplace Just a click Away
Levels Tought:
Elementary,Middle School,High School,College,University,PHD
| Teaching Since: | May 2017 |
| Last Sign in: | 339 Weeks Ago, 6 Days Ago |
| Questions Answered: | 19234 |
| Tutorials Posted: | 19224 |
MBA (IT), PHD
Kaplan University
Apr-2009 - Mar-2014
Professor
University of Santo Tomas
Aug-2006 - Present
The concept of project scope is also interlinked with EVM. This is because EVM is based on the monitoring of a project, which in turn is affected by its scope. The size and complexity of a project can determine or shape the way in which it is implemented and completed. They can also determine the success of the project itself. Do you think that these two variables are related to the concept of EVM itself? How?
APA formating. in text citation if needed and please provide links to reference if website used or what ever reference is used.  2 paragraphs use example(s) if possible.
Hel-----------lo -----------Sir-----------/Ma-----------dam-----------Tha-----------nk -----------you----------- fo-----------r u-----------sin-----------g o-----------ur -----------web-----------sit-----------e a-----------nd -----------acq-----------uis-----------iti-----------on -----------of -----------my -----------pos-----------ted----------- so-----------lut-----------ion-----------.Pl-----------eas-----------e p-----------ing----------- me----------- on----------- ch-----------at -----------I a-----------m ----------- on-----------lin-----------e o-----------r i-----------nbo-----------x m-----------e a----------- me-----------ssa-----------ge -----------I w-----------ill-----------