Maurice Tutor

(5)

$15/per page/Negotiable

About Maurice Tutor

Levels Tought:
Elementary,Middle School,High School,College,University,PHD

Expertise:
Algebra,Applied Sciences See all
Algebra,Applied Sciences,Biology,Calculus,Chemistry,Economics,English,Essay writing,Geography,Geology,Health & Medical,Physics,Science Hide all
Teaching Since: May 2017
Last Sign in: 401 Weeks Ago, 1 Day Ago
Questions Answered: 66690
Tutorials Posted: 66688

Education

  • MCS,PHD
    Argosy University/ Phoniex University/
    Nov-2005 - Oct-2011

Experience

  • Professor
    Phoniex University
    Oct-2001 - Nov-2016

Category > Accounting Posted 20 Aug 2017 My Price 9.00

Master Chef Appliance Company

Master Chef Appliance Company manufactures home kitchen appliances. The manufac- turing process includes stamping, final assembly, testing, and shipping. In the stamping operation, a number of individuals are responsible for stamping the steel outer surface of the appliance. The stamping operation is set up prior to each run. A run of 40 stampings is completed after each setup. A setup requires 60 minutes. The parts wait for the setup to be completed before stamping begins. Each stamping requires 5 minutes of operating time. After each batch is completed, the operator moves the stamped covers to the final assembly area. This move takes 10 minutes to    complete.

The final assembly for each appliance unit requires 22 minutes and is also done in batches of 40 appliance units. The batch of 40 appliance units is moved into the test building, which is across the street. The move takes 25 minutes. In the final test, the 40-unit batch is tested one at a time. Each test requires 8 minutes. The completed units are sent to shipping for packaging and final shipment to customers. A complete batch of 40 units is sent from testing to shipping. The Shipping Department is located next to testing. Thus, there is no move time between these two operations. Packaging and shipment labeling requires 15 minutes per  unit.

 

Instructions

1.     Determine the amount of value-added and non-value-added lead time and the value- added ratio in this process for an average kitchen appliance in a batch of 40 units. Round percentages to one decimal place. Categorize the non-value-added time into wait and move time.

2.     How could this process be improved so as to reduce the amount of waste in the process?

Answers

(5)
Status NEW Posted 20 Aug 2017 10:08 AM My Price 9.00

Hel-----------lo -----------Sir-----------/Ma-----------dam-----------Tha-----------nk -----------You----------- fo-----------r u-----------sin-----------g o-----------ur -----------web-----------sit-----------e a-----------nd -----------and----------- ac-----------qui-----------sit-----------ion----------- of----------- my----------- po-----------ste-----------d s-----------olu-----------tio-----------n.P-----------lea-----------se -----------pin-----------g m-----------e o-----------n c-----------hat----------- I -----------am -----------onl-----------ine----------- or----------- in-----------box----------- me----------- a -----------mes-----------sag-----------e I----------- wi-----------ll