Maurice Tutor

(5)

$15/per page/Negotiable

About Maurice Tutor

Levels Tought:
Elementary,Middle School,High School,College,University,PHD

Expertise:
Algebra,Applied Sciences See all
Algebra,Applied Sciences,Biology,Calculus,Chemistry,Economics,English,Essay writing,Geography,Geology,Health & Medical,Physics,Science Hide all
Teaching Since: May 2017
Last Sign in: 401 Weeks Ago, 1 Day Ago
Questions Answered: 66690
Tutorials Posted: 66688

Education

  • MCS,PHD
    Argosy University/ Phoniex University/
    Nov-2005 - Oct-2011

Experience

  • Professor
    Phoniex University
    Oct-2001 - Nov-2016

Category > Accounting Posted 24 Aug 2017 My Price 13.00

Sebolt Wire Company

High-Low and Scattergraph Analysis

Sebolt Wire Company heats copper ingots to very high temperatures by placing the ingots in a large heat coil. The heated ingots are then run through a shaping machine that shapes the soft ingot into wire. Due to the long heat-up time, the coil is never turned off. When an ingot is placed in the coil, the temperature is raised to an even higher level, and then the coil is allowed to drop to the “waiting” temperature between ingots. Management needs to know the variable cost of power

 

 

 

involved in heating an ingot and the fixed cost of power during “waiting” periods. The following data on ingots processed and power costs are available:

 

 

 

Required:

1.       Using the high-low method, estimate a cost formula for power cost. Express the formula in the form Y = a + bX.

2.       Prepare a scattergraph by plotting ingots processed and power cost on a graph. Draw a straight line though the two data points that correspond to the high and low levels of activity. Make sure your line intersects the Y-axis.

3.       Comment on the accuracy of your high-low estimates assuming a least-squares regression analysis estimated the total fixed costs to be $1,185.45 per month and the variable cost to be

$37.82 per ingot. How would the straight line that you drew in requirement 2 differ from a straight line that minimizes the sum of the squared errors?

 

Answers

(5)
Status NEW Posted 24 Aug 2017 10:08 PM My Price 13.00

Hel-----------lo -----------Sir-----------/Ma-----------dam-----------Tha-----------nk -----------You----------- fo-----------r u-----------sin-----------g o-----------ur -----------web-----------sit-----------e a-----------nd -----------and----------- ac-----------qui-----------sit-----------ion----------- of----------- my----------- po-----------ste-----------d s-----------olu-----------tio-----------n.P-----------lea-----------se -----------pin-----------g m-----------e o-----------n c-----------hat----------- I -----------am -----------onl-----------ine----------- or----------- in-----------box----------- me----------- a -----------mes-----------sag-----------e I----------- wi-----------ll