The world’s Largest Sharp Brain Virtual Experts Marketplace Just a click Away
Levels Tought:
Elementary,Middle School,High School,College,University,PHD
| Teaching Since: | Jul 2017 |
| Last Sign in: | 305 Weeks Ago |
| Questions Answered: | 15833 |
| Tutorials Posted: | 15827 |
MBA,PHD, Juris Doctor
Strayer,Devery,Harvard University
Mar-1995 - Mar-2002
Manager Planning
WalMart
Mar-2001 - Feb-2009
Future production requirements in the turret lathe department must be satisfied through the acquisition of several new machines and the hiring of new operators, the exact number to be determined. There are three new parts that will be produced. Part A has annual quantities of 20,000 units; part B, 32,000 units; and part C, 47,000 units. Corresponding standard times for these parts are 7.3 min, 4.9 min, and 8.4 min, respectively. The department will operate one 8-hour shift for 250 days/yr. The machines are expected to be 98% reliable, and the anticipated scrap rate is 4%. Worker efficiency is expected to be 100%. How many new turret lathes and operators are required to meet these production requirements? Â
Hel-----------lo -----------Sir-----------/Ma-----------dam----------- T-----------han-----------k y-----------ou -----------for----------- yo-----------ur -----------int-----------ere-----------st -----------and----------- bu-----------yin-----------g m-----------y p-----------ost-----------ed -----------sol-----------uti-----------on.----------- Pl-----------eas-----------e p-----------ing----------- me----------- on----------- ch-----------at -----------I a-----------m o-----------nli-----------ne -----------or -----------inb-----------ox -----------me -----------a m-----------ess-----------age----------- I -----------wil-----------l b-----------e q-----------uic-----------kly-----------