Assume all instructions of the computer A design will execute in 8 clock cycles and all instructions of the Computer B design will execute in 7 clock cycles. Also assume that clock period for design A is 66.25 ns while clock period for design B is 75 ns.
Compute the speedup to be expected for the computer of design B.