Levels Tought:
Elementary,Middle School,High School,College,University,PHD
Teaching Since: | May 2017 |
Last Sign in: | 307 Weeks Ago, 3 Days Ago |
Questions Answered: | 66690 |
Tutorials Posted: | 66688 |
MCS,PHD
Argosy University/ Phoniex University/
Nov-2005 - Oct-2011
Professor
Phoniex University
Oct-2001 - Nov-2016
The Wrightsville Beach, North Carolina, water treatment plant produces a distilled water of zero salinity. To reduce the cost of water treatment and supply, the city mixes this desalinated water with untreated groundwater that has a salinity of 500 mg/L. If the desired drinking water is to have a salinity not exceeding 200 mg/L, how much of each water—distilled water and untreated groundwater—is needed to produce a finished water flow of 100 mgd?
Hel-----------lo -----------Sir-----------/Ma-----------dam-----------Tha-----------nk -----------You----------- fo-----------r u-----------sin-----------g o-----------ur -----------web-----------sit-----------e a-----------nd -----------and----------- ac-----------qui-----------sit-----------ion----------- of----------- my----------- po-----------ste-----------d s-----------olu-----------tio-----------n.P-----------lea-----------se -----------pin-----------g m-----------e o-----------n c-----------hat----------- I -----------am -----------onl-----------ine----------- or----------- in-----------box----------- me----------- a -----------mes-----------sag-----------e I----------- wi-----------ll