A control chart controls a manufacturing process. Measurements are taken while the process is operating one time each hour. At each hour five sample parts are measured, and the results are recorded and plotted on a control chart. During the last five hours the following data was observed for X bar and R. The upper control limit for X bar values is 142 and the lower control limit is 102. The value on the control chart for X bar is 122 and the value for R bar is 3. What can be said about this process?
| Â |
9 A.M. |
10 A.M. |
11 A.M. |
12 A.M. |
1 P.M. |
|
X bar |
125 |
126 |
127 |
128 |
129 |
|
R |
2 |
1 |
4 |
2 |
3 |
a. The process is not in control and should be adjusted.
b. The process is in control and should not be adjusted.
c. The value of R is too high at 11.
d. The value for X bar is outside the control limits.
Hel-----------lo -----------Sir-----------/Ma-----------dam-----------Tha-----------nk -----------You----------- fo-----------r u-----------sin-----------g o-----------ur -----------web-----------sit-----------e a-----------nd -----------and----------- ac-----------qui-----------sit-----------ion----------- of----------- my----------- po-----------ste-----------d s-----------olu-----------tio-----------n.P-----------lea-----------se -----------pin-----------g m-----------e o-----------n c-----------hat----------- I -----------am -----------onl-----------ine----------- or----------- in-----------box----------- me----------- a -----------mes-----------sag-----------e I----------- wi-----------ll