Reconsider Problem. Management has determined that the project must be completed in 25 weeks or less, and that “cost is no object.” How many paths will need to be crashed in order to meet this goal? Which activities do not need to be considered for crashing?
Problem:
Consider the following project activities:
a. (*) Draw the project network diagram.
b. (*) Identify all the paths through the network and their lengths.
c. (**) Identify all the critical activities and path(s).How long will the entire project take?
d. (**) Which activity or activities have the most slack? What are the practical implications of this slack?
|
ACTIVITY
|
DURATION (WEEKS)
|
PREDECESSORS
|
|
A |
4 |
None |
|
B |
5 |
None |
|
C |
7 |
B |
|
D |
3 |
A, C |
|
E |
6 |
B |
|
F |
6 |
D |
|
G |
8 |
D |
|
H |
4 |
E, G |
Hel-----------lo -----------Sir-----------/Ma-----------dam-----------Tha-----------nk -----------You----------- fo-----------r u-----------sin-----------g o-----------ur -----------web-----------sit-----------e a-----------nd -----------and----------- ac-----------qui-----------sit-----------ion----------- of----------- my----------- po-----------ste-----------d s-----------olu-----------tio-----------n.P-----------lea-----------se -----------pin-----------g m-----------e o-----------n c-----------hat----------- I -----------am -----------onl-----------ine----------- or----------- in-----------box----------- me----------- a -----------mes-----------sag-----------e I----------- wi-----------ll