Maurice Tutor

(5)

$15/per page/Negotiable

About Maurice Tutor

Levels Tought:
Elementary,Middle School,High School,College,University,PHD

Expertise:
Algebra,Applied Sciences See all
Algebra,Applied Sciences,Biology,Calculus,Chemistry,Economics,English,Essay writing,Geography,Geology,Health & Medical,Physics,Science Hide all
Teaching Since: May 2017
Last Sign in: 408 Weeks Ago, 6 Days Ago
Questions Answered: 66690
Tutorials Posted: 66688

Education

  • MCS,PHD
    Argosy University/ Phoniex University/
    Nov-2005 - Oct-2011

Experience

  • Professor
    Phoniex University
    Oct-2001 - Nov-2016

Category > Management Posted 09 Oct 2017 My Price 9.00

Holmes Manufacturing

Problem 12-19
New project analysis

Holmes Manufacturing is considering a new machine that costs $210,000 and would reduce pretax manufacturing costs by $90,000 annually. Holmes would use the 3-year MACRS method to depreciate the machine, and management thinks the machine would have a value of $24,000 at the end of its 5-year operating life. The applicable depreciation rates are 33%, 45%, 15%, and 7%. Net operating working capital would increase by $26,000 initially, but it would be recovered at the end of the project's 5-year life. Holmes' marginal tax rate is 40%, and a 13% WACC is appropriate for the project.

a. Calculate the project's NPV. Round your answer to the nearest cent.
$   

Calculate the project's IRR. Round your answer to two decimal places.
%

Calculate the project's MIRR. Round your answer to two decimal places.
%

Calculate the project's payback. Round your answer to two decimal places.
years

b. Assume management is unsure about the $90,000 cost savings-this figure could deviate by as much as plus or minus 20%. What would the NPV be under each of these situations? Round your answers to the nearest cent.
20% savings increase. $   
20% savings decrease. $   

c. Suppose the CFO wants you to do a scenario analysis with different values for the cost savings, the machine's salvage value, and the net operating working capital (NOWC) requirement. She asks you to use the following probabilities and values in the scenario analysis:

Scenario Probability Cost Savings Salvage Value NOWC
Worst case 0.35 $72,000 $19,000 $31,000
Base case 0.35 $90,000 $24,000 $26,000
Best case 0.30 $108,000 $29,000 $21,000



Calculate the project's expected NPV, its standard deviation, and its coefficient of variation. Round your answers to two decimal places.

E(NPV) = $   

A?A?NPV = $   

CV =  

Would you recommend that the project be accepted?
-Select-yesnoItem 10

Answers

(5)
Status NEW Posted 09 Oct 2017 10:10 PM My Price 9.00

Hel-----------lo -----------Sir-----------/Ma-----------dam-----------Tha-----------nk -----------You----------- fo-----------r u-----------sin-----------g o-----------ur -----------web-----------sit-----------e a-----------nd -----------and----------- ac-----------qui-----------sit-----------ion----------- of----------- my----------- po-----------ste-----------d s-----------olu-----------tio-----------n.P-----------lea-----------se -----------pin-----------g m-----------e o-----------n c-----------hat----------- I -----------am -----------onl-----------ine----------- or----------- in-----------box----------- me----------- a -----------mes-----------sag-----------e I----------- wi-----------ll

Not Rated(0)