The world’s Largest Sharp Brain Virtual Experts Marketplace Just a click Away
Levels Tought:
Elementary,Middle School,High School,College,University,PHD
| Teaching Since: | May 2017 |
| Last Sign in: | 409 Weeks Ago, 1 Day Ago |
| Questions Answered: | 66690 |
| Tutorials Posted: | 66688 |
MCS,PHD
Argosy University/ Phoniex University/
Nov-2005 - Oct-2011
Professor
Phoniex University
Oct-2001 - Nov-2016
Estimate the hourly production and unit cost of rock excavation by drilling and blasting. The rock is a limestone having a seismic velocity of 6000 ft/s (1830 m/s). Trial blasting indicates that 3½-in. (8.9-cm) holes drilled in an 8-ft (2.44-m) rectangular pattern will provide the desired fracturing. A hole depth of 20 ft (6.1 m) yields an effective depth of 18 ft (5.5 m). The average drilling rate is estimated to be 70 ft fh (21.4 m/h). A powder factor of 1 Ib/BCY (0.59 kg/BCM) of ANFO will be used.
Â

Hel-----------lo -----------Sir-----------/Ma-----------dam-----------Tha-----------nk -----------You----------- fo-----------r u-----------sin-----------g o-----------ur -----------web-----------sit-----------e a-----------nd -----------and----------- ac-----------qui-----------sit-----------ion----------- of----------- my----------- po-----------ste-----------d s-----------olu-----------tio-----------n.P-----------lea-----------se -----------pin-----------g m-----------e o-----------n c-----------hat----------- I -----------am -----------onl-----------ine----------- or----------- in-----------box----------- me----------- a -----------mes-----------sag-----------e I----------- wi-----------ll