The world’s Largest Sharp Brain Virtual Experts Marketplace Just a click Away
Levels Tought:
Elementary,Middle School,High School,College,University,PHD
| Teaching Since: | May 2017 |
| Last Sign in: | 432 Weeks Ago, 5 Days Ago |
| Questions Answered: | 66690 |
| Tutorials Posted: | 66688 |
MCS,PHD
Argosy University/ Phoniex University/
Nov-2005 - Oct-2011
Professor
Phoniex University
Oct-2001 - Nov-2016
11.1 In a fire-tube boiler, hot products of combustion flow- ing through an array of thin-walled tubes are used to
Fouling factors
R"f,o
R"f,i
Tube, SS302
![]()
boil water flowing over the tubes. At the time of instal- lation, the overall heat transfer coefficient was
400 W/m2 · K. After 1 year of use, the inner and outer
Tm,i
= 75°C
tube surfaces are fouled, with corresponding fouling factors of Rƒ",i 0.0015 and Rƒ",o 0.0005 m2 · K/W, respectively. Should the boiler be scheduled for clean- ing of the tube surfaces?
Hel-----------lo -----------Sir-----------/Ma-----------dam-----------Tha-----------nk -----------You----------- fo-----------r u-----------sin-----------g o-----------ur -----------web-----------sit-----------e a-----------nd -----------and----------- ac-----------qui-----------sit-----------ion----------- of----------- my----------- po-----------ste-----------d s-----------olu-----------tio-----------n.P-----------lea-----------se -----------pin-----------g m-----------e o-----------n c-----------hat----------- I -----------am -----------onl-----------ine----------- or----------- in-----------box----------- me----------- a -----------mes-----------sag-----------e I----------- wi-----------ll