Maurice Tutor

(5)

$15/per page/Negotiable

About Maurice Tutor

Levels Tought:
Elementary,Middle School,High School,College,University,PHD

Expertise:
Algebra,Applied Sciences See all
Algebra,Applied Sciences,Biology,Calculus,Chemistry,Economics,English,Essay writing,Geography,Geology,Health & Medical,Physics,Science Hide all
Teaching Since: May 2017
Last Sign in: 408 Weeks Ago, 3 Days Ago
Questions Answered: 66690
Tutorials Posted: 66688

Education

  • MCS,PHD
    Argosy University/ Phoniex University/
    Nov-2005 - Oct-2011

Experience

  • Professor
    Phoniex University
    Oct-2001 - Nov-2016

Category > Management Posted 15 Nov 2017 My Price 7.00

object-oriented development process

1. At which point are errors are most costly to correct?

a. programming

b. conceptual design

c. analysis

d. detailed design

e. implementation

2. User acceptance testing is more important in an object-oriented development process than in a traditional environment because of the implications of the

a. absence of traditional design documents.

b. lack of a tracking system for changes.

c. potential for continuous monitoring.

d. inheritance of properties in hierarchies.

3. Which of the following sets of application characteristics of an accounting application might influence the selection of data entry devices and media for a computerized accounting system?

a. Timing of feedback needs relative to input, need for documentation of an activity, and the necessity for reliability and accuracy.

b. Cost considerations, volume of input, complexity of activity, and liquidity of assets involved.

c. Need for documentation, necessity for accuracy and reliability, volume of output, and cost considerations.

d. Relevancy of data, volume of input, cost considerations, volume of output, and timing of feedback needs relative to input.

e. Type of file used, reliability of manufacturer’s service, volume of output, and cost considerations.

4. What is the name given to the systems development approach used to quickly produce a model of user interfaces, user interactions with the system, and process logic?

a. neural networking

b. prototyping

c. reengineering

d. application generation

5. The PERT is combined with cost data to produce a PERT cost analysis to

a. calculate the total project cost inclusive of the additional slack time.

b. evaluate and optimize trade-offs between time of an event’s completion and its cost to complete.

c. implement computer-integrated manufacturing concepts.

d. avoid the problem of time variance analysis.

e. calculate expected activity times.

Answers

(5)
Status NEW Posted 15 Nov 2017 08:11 PM My Price 7.00

Hel-----------lo -----------Sir-----------/Ma-----------dam-----------Tha-----------nk -----------You----------- fo-----------r u-----------sin-----------g o-----------ur -----------web-----------sit-----------e a-----------nd -----------acq-----------uis-----------iti-----------on -----------of -----------my -----------pos-----------ted----------- so-----------lut-----------ion-----------.Pl-----------eas-----------e p-----------ing----------- me----------- on-----------cha-----------t I----------- am----------- on-----------lin-----------e o-----------r i-----------nbo-----------x m-----------e a----------- me-----------ssa-----------ge -----------I w-----------ill----------- be-----------

Not Rated(0)