The world’s Largest Sharp Brain Virtual Experts Marketplace Just a click Away
Levels Tought:
Elementary,Middle School,High School,College,University,PHD
| Teaching Since: | Jul 2017 |
| Last Sign in: | 305 Weeks Ago |
| Questions Answered: | 15833 |
| Tutorials Posted: | 15827 |
MBA,PHD, Juris Doctor
Strayer,Devery,Harvard University
Mar-1995 - Mar-2002
Manager Planning
WalMart
Mar-2001 - Feb-2009
ITEC 640 Mid-term Exam.
Â
Please review the attached document
ITEC 640 Mid-term Exam.
Â
 The response to each of the following questions should include in-text citations where appropriate and complete references in APA format (for each and every question). Please take a graduate-level, well thought-out approach to your responses. Surface-level answers will not receive full credit.
You should type your responses to each question immediately below the question using Times New Roman 12.
Â
 Each question below (numbers 16 – 20) is worth 14 points each
Â
1.     List and describe each of the ten project management knowledge areas.
Â
2.       Explain the advantages of obtaining PMP certification?
Â
3.       a) Identify the top three reasons for information systems project failure as described by
Olson (2014).
    b) Provide at least one example of a typical situation related to each of the three reasons.
    c) Describe reasonable approaches a project manager can take to avoid or mitigate each of the three failure modes identified in part 1 of this topic.
4.     Consider the use of four types of charts as applied to project management:Â
a) Milestone Chart
b) Flow Chart
c) Gantt Chart
d) Network Diagram
Â
Describe the format and/or content of each type of chart and give a practical example of when and how each of the four types of chart would be used for an IT project. Include a description of the advantages and disadvantages of each type of chart.
5.     Draw a WBS diagram. The WBS diagram is to have 4 (four) levels. The first level should represent the entire project and display the name of the project.  Â
b) Be sure to include appropriate numbering and that all lines are appropriately connected.
c) Provide a written description of the project for the WBS diagram.  Your written description should provide detail for every block. Â
d) The WBS diagram and its corresponding written description of the project should be an original work by you that was developed for this exam.Â
Attachments:
----------- Â ----------- H-----------ell-----------o S-----------ir/-----------Mad-----------am ----------- Th-----------ank----------- yo-----------u f-----------or -----------you-----------r i-----------nte-----------res-----------t a-----------nd -----------buy-----------ing----------- my----------- po-----------ste-----------d s-----------olu-----------tio-----------n. -----------Ple-----------ase----------- pi-----------ng -----------me -----------on -----------cha-----------t I----------- am----------- on-----------lin-----------e o-----------r i-----------nbo-----------x m-----------e a----------- me-----------ssa-----------ge -----------I w-----------ill----------- be----------- qu-----------ick-----------ly