Accounting,Algebra,Architecture and Design,Art & Design,Biology,Business & Finance,Calculus,Chemistry,Communications,Computer Science,Environmental science,Essay writing,Programming,Social Science,Statistics Hide all
Teaching Since:
Apr 2017
Last Sign in:
438 Weeks Ago, 2 Days Ago
Questions Answered:
9562
Tutorials Posted:
9559
Education
bachelor in business administration
Polytechnic State University Sanluis Jan-2006 - Nov-2010
CPA
Polytechnic State University Jan-2012 - Nov-2016
Experience
Professor
Harvard Square Academy (HS2) Mar-2012 - Present
Category > EngineeringPosted 19 May 2017My Price7.00
Francis turbine Units 19, 20, and 21, installed at the Grand Coulee Dam
Â
Francis turbine Units 19, 20, and 21, installed at the Grand Coulee Dam on the Columbia River, are very large [46]. Each runner is 32.6 ft in diameter and contains] 550 tons of cast steel. At rated conditions, each turbine develops 820,000 hp at 72 rpm under 285 ft of head. Efficiency is nearly 95 percent at rated conditions. Thel turbines operate at heads from 220 to 355 ft. Calculate the specific speed at rated operating conditions. Estimate the maximum water flow rate through each turbine.!