P4-1B VideoPlus, Inc. manufactures two types of DVD players, a deluxe model and a standard model. The deluxe model is a multi-format progressive-scan DVD player with networking capability, Dolby digital, and DTS decoder. The standard model’s primary fea- ture is progressive-scan. Annual production is 50,000 units for the deluxe and 20,000 units for the standard.
Both products require 2 hours of direct labor for completion. Therefore, total annual direct labor hours are 140,000 [2 hrs. X (20,000 + 50,000)]. Expected annual manufac- turing overhead is $980,000. Thus, the predetermined overhead rate is $7 ($980,000 --- 140,000) per direct labor hour. The direct materials cost per unit is $42 for the deluxe model and $11 for the standard model. The direct labor cost is $18 per unit for both the deluxe and the standard models.
The company’s managers identified six activity cost pools and related cost drivers and accumulated overhead by cost pool as   follows.
Â
Expected
Use of              Expected Use of Estimated           Cost      Drivers by Product
Â
Â
Â
Â
|
Activity Cost Pool |
 |
Cost Driver |
 |
Overhead |
 |
Drivers |
 |
Standard |
 |
Deluxe |
|
Purchasing |
 |
Orders |
 |
$130,000 |
 |
400 |
 |
100 |
 |
300 |
|
Receiving |
 |
Pounds |
 |
30,000 |
 |
20,000 |
 |
4,000 |
 |
16,000 |
|
Assembling |
 |
Number of parts |
 |
370,000 |
 |
74,000 |
 |
20,000 |
 |
54,000 |
|
Testing |
 |
Number of tests |
 |
115,000 |
 |
23,000 |
 |
10,000 |
 |
13,000 |
|
Finishing |
 |
Units |
 |
140,000 |
 |
70,000 |
 |
20,000 |
 |
50,000 |
|
Packing and shipping |
 |
Pounds |
 |
195,000 |
 |
80,000 |
 |
18,000 |
 |
62,000 |
|
 |
 |
 |
 |
$980,000 |
 |
 |
 |
 |
 |
 |
Â
Instructions
(a)Â Â Under traditional product costing, compute the total unit cost of both products. Prepare a simple comparative schedule of the individual costs by product (similar to Illustration 4-10 on page 158).
(b)Â Â Under ABC, prepare a schedule showing the computations of the activity-based over- head rates (per cost driver).
(c)   Prepare a schedule assigning each activity’s overhead cost pool to each product based on the use of cost drivers. (Include a computation of overhead cost per unit, round- ing to the nearest cent.)
(d)Â Â Compute the total cost per unit for each product under ABC.
(e)   Classify each of the activities as a value-added activity or a non–value-added activity.
(f)Â Â Â Comment on (1) the comparative overhead cost per unit for the two products under ABC, and (2) the comparative total costs per unit under traditional costing and ABC.
Â
Hel-----------lo -----------Sir-----------/Ma-----------dam-----------Tha-----------nk -----------You----------- fo-----------r u-----------sin-----------g o-----------ur -----------web-----------sit-----------e a-----------nd -----------acq-----------uis-----------iti-----------on -----------of -----------my -----------pos-----------ted----------- so-----------lut-----------ion-----------.Pl-----------eas-----------e p-----------ing----------- me----------- on-----------cha-----------t I----------- am----------- on-----------lin-----------e o-----------r i-----------nbo-----------x m-----------e a----------- me-----------ssa-----------ge -----------I w-----------ill----------- be-----------