Could you please explain:
Answer:
Forepoling is a method of advancing a mine working or tunnel in loose, caving, or running ground, such as water bearing sand or silt, by driving sharp-pointed poles, timbers, sections of steel, or slabs into the ground ahead of, or simultaneously with, the excavation. Forepoling is generally employed under the following conditions: the existence of shallow overburden above the tunnel; the need to restrict ground subsurface settlement; and poor ground conditions.
There are three different methods of forepoling commonly used in tunneling:
Sub-horizontal jet grouting - Jet grouting is used in especially difficult conditions where both weak soils and thin overburden occur. Jet grouting is normally used in sandy or gravel formations.
Spiling - The spiling method consists of drilled steel pipes, grout inside the pipes and in voids outside, treated ground by permeation or fracture grouting and steel arch supports. Injection is the essential part of this system in forming the arch-like structure. Grouting is done to strengthen weak and loose soils, to decrease permeability, to reduce subsidence effects caused by dewatering and to stabilize sandy soils.
Pipe roof - Forepoling in the pipe roof method is formed in a crown of a tunnel by installing a series of large diameter steel or concrete tubes in an arch or a ring. This is done when overburden is especially thin. Typical installation methods are by pipe jacking and other micro tunneling methods. Pipe roof method pipes are designed to carry longitudinal loads only. They are typically made from open shafts and can be driven parallel to the tunnel axis.
Hel-----------lo -----------Sir-----------/Ma-----------dam-----------Tha-----------nk -----------You----------- fo-----------r u-----------sin-----------g o-----------ur -----------web-----------sit-----------e a-----------nd -----------acq-----------uis-----------iti-----------on -----------of -----------my -----------pos-----------ted----------- so-----------lut-----------ion-----------.Pl-----------eas-----------e p-----------ing----------- me----------- on-----------cha-----------t I----------- am----------- on-----------lin-----------e o-----------r i-----------nbo-----------x m-----------e a----------- me-----------ssa-----------ge -----------I w-----------ill----------- be-----------