Given the project information in the table below, draw a fully analyzed AOA network diagram for the project, showing all ET and LT values at each node. Develop an activities boundary timetable, define the critical path, and determine the normal total project cost and duration. Assuming partial crashing is allowed, determine the minimum cost of crashing the project duration by 2 days.
Â

Show transcribed image text Given the project information in the table below, draw a fully analyzed AOA network diagram for the project, showing all ET and LT values at each node. Develop an activities boundary timetable, define the critical path, and determine the normal total project cost and duration. Assuming partial crashing is allowed, determine the minimum cost of crashing the project duration by 2 days.
Hel-----------lo -----------Sir-----------/Ma-----------dam-----------Tha-----------nk -----------You----------- fo-----------r u-----------sin-----------g o-----------ur -----------web-----------sit-----------e a-----------nd -----------acq-----------uis-----------iti-----------on -----------of -----------my -----------pos-----------ted----------- so-----------lut-----------ion-----------.Pl-----------eas-----------e p-----------ing----------- me----------- on-----------cha-----------t I----------- am----------- on-----------lin-----------e o-----------r i-----------nbo-----------x m-----------e a----------- me-----------ssa-----------ge -----------I w-----------ill----------- be-----------