F l e xib l e budget p r epa r ation, servi c e secto r .
Münzel GmbH helps prospective homeowners of substantial means to find low-cost financ- ing and assists existing homeowners in refinancing their current loans at lower interest rates. Münzel works only for customers with excellent borrowing potential. Hence, Münzel is able to obtain a loan for every customer with whom it decides to work.
Münzel charges clients 0.5% of the loan amount it arranges. In 2005, the average loan amount per customer was €199 000. In 2006, the average loan amount was €200 210. In its
2007 flexible budgeting system, Münzel assumes the average loan amount will be €200 000. Budgeted cost data per loan application for 2007 are:
● Professional labour: 6 budgeted hours at a budgeted rate of €40 per hour
● Loan filing fees: budgeted at €100 per loan application
● Credit checks: budgeted at €120 per loan application
● Courier mailings: budgeted at €50 per loan application.
Office support (the costs of leases, secretarial workers and others) is budgeted to be €31 000 per month. Münzel GmbH views this amount as a fixed cost.
Required
1 Prepare a static budget for November 2007 assuming 90 loan applications.
2 Actual loan applications in November 2007 were 120. Other actual data for November
2007 were:
● Professional labour: 7.2 hours per loan application at €42 per hour
● Loan filing fees: €100 per loan application
● Credit checks: €125 per loan application
● Courier mailings: €54 per loan application.
Office support costs for November 2007 were €33 500. The average loan amount for
November 2007 was €224 000. Münzel received its 0.5% fee on all loans. Prepare a Level
2 variance analysis of Münzel GmbH for November 2007. Münzel’s output measure in its flexible budgeting system is the number of loan applications.
3 Calculate professional labour price and efficiency variances for November 2007. (Calculate labour price on a per-hour basis.)
4 What factors would you consider in evaluating the effectiveness of professional labour in November 2007?
Hel-----------lo -----------Sir-----------/Ma-----------dam-----------Tha-----------nk -----------You----------- fo-----------r u-----------sin-----------g o-----------ur -----------web-----------sit-----------e a-----------nd -----------acq-----------uis-----------iti-----------on -----------of -----------my -----------pos-----------ted----------- so-----------lut-----------ion-----------.Pl-----------eas-----------e p-----------ing----------- me----------- on-----------cha-----------t I----------- am----------- on-----------lin-----------e o-----------r i-----------nbo-----------x m-----------e a----------- me-----------ssa-----------ge -----------I w-----------ill----------- be-----------