       The peak demand (in kW) for the last 12 months is:
          Jan. Feb.  Mar.   Apr. May June  July  Aug. Sept. Oct. Nov. Dec.
          900 735    680   695  740  720   710   650   660   690  685  710
          Once a year in January, the facility tests their large fire suppression system pump during the afternoon, by running them at full load for 4 hours.Â
          The pump size 300hp (224 kW).
What are the estimated cost savings by scheduling the tests to be run by at night, when no production processes are occurring
Hel-----------lo -----------Sir-----------/Ma-----------dam-----------Tha-----------nk -----------You----------- fo-----------r u-----------sin-----------g o-----------ur -----------web-----------sit-----------e a-----------nd -----------acq-----------uis-----------iti-----------on -----------of -----------my -----------pos-----------ted----------- so-----------lut-----------ion-----------.Pl-----------eas-----------e p-----------ing----------- me----------- on----------- ch-----------at -----------I a-----------m o-----------nli-----------ne -----------or -----------inb-----------ox -----------me -----------a m-----------ess-----------age----------- I -----------wil-----------l b-----------e