Hickory Company manufactures two productsAc€??14,000 units of Product Y and 6,000 units of Product Z. The company uses a plantwide overhead rate based on direct labor-hours. It is considering implementing an activity-based costing (ABC) system that allocates all of its manufacturing overhead to four cost pools. The following additional information is available for the company as a whole and for Products Y and Z: |
 Â
| Activity Cost Pool | Activity Measure | Estimated Overhead Cost | Expected Activity | ||
| Â Â Machining | Machine-hours | $ | 200,000 Â Â | 10,000 | MHs |
| Â Â Machine setups | Number of setups | $ | 100,000Â Â Â | 200 | setups |
| Â Â Production design | Number of products | $ | 84,000Â Â Â | 2 | products |
| Â Â General factory | Direct labor-hours | $ | 300,000 Â Â | 12,000 | DLHs |
| Â | |||||
 Â
| Activity Measure | Product Y | Product Z |
| Â Â Machine-hours | 7,000 | 3,000 |
| Â Â Number of setups | 50 | 150 |
| Â Â Number of products | 1 | 1 |
| Â Â Direct labor-hours | 8,000 | 4,000 |
| Â | ||
rev: 10_24_2014_QC_57437
1.
value:
0.66 points
| Required: |
| What is the companyAc€?cs plantwide overhead rate? |
| Â |
ask your instructor a questioncheck my workreferencesebook & resources
2.
value:
0.66 points
| Required: |
|
Using the plantwide overhead rate, how much manufacturing overhead cost is allocated to Product Y and Product Z? |
| Â |
ask your instructor a questioncheck my workreferencesebook & resources
3.
value:
0.66 points
| Required: |
| What is the activity rate for the Machining activity cost pool? |
| Â |
ask your instructor a questioncheck my workreferencesebook & resources
4.
value:
0.66 points
| Required: |
| What is the activity rate for the Machine Setups activity cost pool? |
| Â |
ask your instructor a questioncheck my workreferencesebook & resources
5.
value:
0.66 points
| Required: |
| What is the activity rate for the Product Design activity cost pool? |
| Â |
ask your instructor a questioncheck my workreferencesebook & resources
6.
value:
0.66 points
| Required: |
| What is the activity rate for the General Factory activity cost pool? |
| Â |
ask your instructor a questioncheck my workreferencesebook & resources
7.
value:
0.66 points
| Required: |
| Which of the four activities is a batch-level activity? |
| Â Â |
| Â | General factory activity |
| Â | Machine setups activity |
| Â | Product design activity |
| Â | Machining activity |
ask your instructor a questioncheck my workreferencesebook & resources
8.
value:
0.66 points
| Required: |
| Which of the four activities is a product-level activity? |
| Â Â |
| Â | Machining activity |
| Â | Product design activity |
| Â | General factory activity |
| Â | Machine setups activity |
ask your instructor a questioncheck my workreferencesebook & resources
9.
value:
0.66 points
| Required: |
|
Using the ABC system, how much total manufacturing overhead cost would be assigned to Product Y? (Do not round intermediate calculations.) |
| Â |
rev: 10_24_2014_QC_57437
ask your instructor a questioncheck my workreferencesebook & resources
10.
value:
0.66 points
| Required: |
|
Using the ABC system, how much total manufacturing overhead cost would be assigned to Product Z? (Do not round intermediate calculations.) |
| Â |
rev: 10_24_2014_QC_57437
ask your instructor a questioncheck my workreferencesebook & resources
11.
value:
0.66 points
| Required: |
| Using the plantwide overhead rate, what percentage of the total overhead cost is allocated to Product Y and Product Z? (Round your "Percentage" answer to 1 decimal place. (i.e. .1234 should be entered as 12.3)) |
| Â |
ask your instructor a questioncheck my workreferencesebook & resources
12.
value:
0.66 points
| Required: |
| Using the ABC system, what percentage of the Machining costs is assigned to Product Y and Product Z? |
| Â |
ask your instructor a questioncheck my workreferencesebook & resources
13.
value:
0.66 points
| Required: |
| Using the ABC system, what percentage of Machine Setups cost is assigned to Product Y and Product Z? |
| Â |
ask your instructor a questioncheck my workreferencesebook & resources
14.
value:
0.66 points
| Required: |
| Using the ABC system, what percentage of the Product Design cost is assigned to Product Y and Product Z? |
| Â |
ask your instructor a questioncheck my workreferencesebook & resources
15.
value:
0.76 points
| Required: |
| Using the ABC system, what percentage of the General Factory cost is assigned to Product Y and Product Z? (Round your "Percentage" answer to 1 decimal place. (i.e. .1234 should be entered as 12.3)) |
Â
-----------