Accounting,Algebra,Architecture and Design,Art & Design,Biology,Business & Finance,Calculus,Chemistry,Communications,Computer Science,Environmental science,Essay writing,Programming,Social Science,Statistics Hide all
Teaching Since:
Apr 2017
Last Sign in:
438 Weeks Ago, 1 Day Ago
Questions Answered:
9562
Tutorials Posted:
9559
Education
bachelor in business administration
Polytechnic State University Sanluis Jan-2006 - Nov-2010
CPA
Polytechnic State University Jan-2012 - Nov-2016
Experience
Professor
Harvard Square Academy (HS2) Mar-2012 - Present
Category > EngineeringPosted 09 Jun 2017My Price6.00
A proposed embankment fill requires 3500 m3 of compacted soil.
A proposed embankment fill requires 3500 m3 of compacted soil. The void ratio of the compacted fill is specified as 0.65. Four borrow pits are available, as described in the following table, which lists the respective void ratios of the soil and the cost per cubic meter for moving the soil to the proposed construction site. Make the necessary calculations to select the pit from which the soil should be bought to minimize the cost. Assume Gs to be the same at all pits.