The world’s Largest Sharp Brain Virtual Experts Marketplace Just a click Away
Levels Tought:
Elementary,Middle School,High School,College,University,PHD
| Teaching Since: | May 2017 |
| Last Sign in: | 398 Weeks Ago, 1 Day Ago |
| Questions Answered: | 66690 |
| Tutorials Posted: | 66688 |
MCS,PHD
Argosy University/ Phoniex University/
Nov-2005 - Oct-2011
Professor
Phoniex University
Oct-2001 - Nov-2016
The pipeline described in question 7.1 was used to carry wastewater to a hold-uptank. The effluent is not hazardous. A decision has to be made on what materialto use to replace the pipe. Three suggestion have been made:1. Replace with the same schedule carbon steel pipe and accept renewal at 3-yearintervals.2. Replace with a thicker pipe, schedule 80, outside diameter 114.3 mm (4.5 in),inside diameter 97.2 mm (3.826 in).3. Use stainless steel pipe, which will not corrode.The estimated cost of the pipes, per unit length is: schedule 40 carbon steel £3 ($5),schedule 80 carbon steel £5 ($8.3), stainless steel (304) schedule 40 £15 ($24.8).Installation and fittings for all the materials adds £10 ($16.5) per unit length.The downtime required to replace the pipe does not result in a loss of production.If the expected future life of the plant is 7 years, recommend which pipe to use.
Hel-----------lo -----------Sir-----------/Ma-----------dam----------- Â----------- -----------Tha-----------nk -----------You----------- fo-----------r u-----------sin-----------g o-----------ur -----------web-----------sit-----------e a-----------nd -----------acq-----------uis-----------iti-----------on -----------of -----------my -----------sol-----------uti-----------on.-----------Ple-----------ase----------- pi-----------ng -----------me -----------on -----------cha-----------t I----------- am----------- on-----------lin-----------e o-----------r i-----------nbo-----------x m-----------e a----------- me-----------ssa-----------ge -----------I w-----------ill----------- be----------- ca-----------tch-----------