Maurice Tutor

(5)

$15/per page/Negotiable

About Maurice Tutor

Levels Tought:
Elementary,Middle School,High School,College,University,PHD

Expertise:
Algebra,Applied Sciences See all
Algebra,Applied Sciences,Biology,Calculus,Chemistry,Economics,English,Essay writing,Geography,Geology,Health & Medical,Physics,Science Hide all
Teaching Since: May 2017
Last Sign in: 401 Weeks Ago, 2 Days Ago
Questions Answered: 66690
Tutorials Posted: 66688

Education

  • MCS,PHD
    Argosy University/ Phoniex University/
    Nov-2005 - Oct-2011

Experience

  • Professor
    Phoniex University
    Oct-2001 - Nov-2016

Category > Accounting Posted 08 Aug 2017 My Price 12.00

Tom Belford and Tony Sorrentino

Problem 10-41  Setting Standards, Materials and Labor Variances

Tom Belford and Tony Sorrentino own a small business devoted to kitchen and bath granite installations. Recently, building contractors have insisted on up-front bid prices for a house rather than the cost-plus system that Tom and Tony were used to. They worry because natural flaws in the granite make it impossible to tell in advance exactly how much granite will be used on a particular job. In addition, granite can be easily broken, meaning that Tom or Tony could ruin a slab and would need to start over with a new one. Sometimes the improperly cut pieces could be used for smaller installations, sometimes not. All their accounting is done by a local certified public accounting firm headed by Charlene Davenport. Charlene listened to their con- cerns and suggested that it might be time to implement tighter controls by setting up a standard costing system.

 

 

 

                                                                          

 

 

Charlene reviewed the invoices pertaining to a number of Tom and Tony’s previous jobs to determine the average amount of granite and glue needed per square foot. She then updated pri- ces on both materials to reflect current conditions. The standards she developed for one square foot of counter installed were as follows:

Granite, per square foot                                                    $50.00

Glue (10 oz. @ $0.15)                                                           1.50

Direct labor hours:

Cutting labor (0.10 hr. @ $15)                                           1.50

Installation labor (0.25 hr. @ $25)                                     6.25

These standards assumed that one seamless counter requires one sink cut (the space into which the sink will fit) as well as cutting the counter to fit the space available.

Charlene tracked the actual costs incurred by Tom and Tony for granite installation for the next six months. She found that they completed 50 jobs with an average of 32 square feet of granite installed in each one. The following information on actual amounts used and cost was gathered:

Granite purchased and used (1,640 sq. ft.)                                                                                $79,048 Glue purchased and used (16,000 oz.)                              $ 2,560 Actual hours cutting labor                                                                                                                             180

Actual hours installation labor                                                 390

 

The actual wage rate for cutting and installation labor remained unchanged from the standard rate.

Required:

1.       Calculate the materials price variances and materials usage variances for granite and for glue for the past six months.

2.       Calculate the labor rate variances and labor efficiency variances for cutting labor and for installation labor for the past six months.

3.       CONCEPTUAL CONNECTION Would it be worthwhile for Charlene to establish standards for atypical jobs (such as those with more than one sink cut or wider than normal)?

Answers

(5)
Status NEW Posted 08 Aug 2017 05:08 PM My Price 12.00

Hel-----------lo -----------Sir-----------/Ma-----------dam-----------Tha-----------nk -----------You----------- fo-----------r u-----------sin-----------g o-----------ur -----------web-----------sit-----------e a-----------nd -----------and----------- ac-----------qui-----------sit-----------ion----------- of----------- my----------- po-----------ste-----------d s-----------olu-----------tio-----------n.P-----------lea-----------se -----------pin-----------g m-----------e o-----------n c-----------hat----------- I -----------am -----------onl-----------ine----------- or----------- in-----------box----------- me----------- a -----------mes-----------sag-----------e I----------- wi-----------ll