6:Resource –Leveled Gantt Chart
Â
Assuming that one worker is required for each activity, prepare a resource-leveled schedule. What is the maximum number of workers required to finish the project on time? Show all work and provide a completed Gantt chart using Excel.
Â
Â
7: CPM NETWORK ANALYSIS
Â
Given the data in the table below, perform a critical path analysis to determine the project’s critical path. Draw a AON project network diagram for the project. Identify all of the possible paths, duration of each path, and identify the critical path. Calculate and indicate the ES/EF schedule, LS/LF schedule, and slack. Show all work and provide a completed Gantt chart of the CPM Network Analysis. Note: Use the drawing tool in Word, Excel or PowerPoint to draw the diagram. Use Excel to create a Gantt chart.
Â
Â
|
Activity |
Duration |
Predecessor(s) |
|
A |
3 weeks |
-- |
|
B |
15 weeks |
A |
|
C |
5 weeks |
B |
|
D |
3 weeks |
C |
|
E |
6 weeks |
B |
|
F |
4 weeks |
E |
|
G |
2 weeks |
D, F |
Â
Â
8: PERT ANALYSIS
Â
Using the following data values for minimum expected activity durations and maximum expected activity durations, provide a PERT analysis of the network analysis given in question 7. Include all calculations and show all work.
Â
Â
|
Activity |
Minimum Duration |
Maximum Duration |
|
A |
2 |
4 |
|
B |
12 |
18 |
|
C |
3 |
7 |
|
D |
2 |
4 |
|
E |
4 |
8 |
|
F |
3 |
5 |
|
G |
1 |
3 |
-----------