CourseLover

(12)

$10/per page/Negotiable

About CourseLover

Levels Tought:
Elementary,Middle School,High School,College,University,PHD

Expertise:
Algebra,Applied Sciences See all
Algebra,Applied Sciences,Architecture and Design,Art & Design,Biology,Business & Finance,Calculus,Chemistry,Engineering,Health & Medical,HR Management,Law,Marketing,Math,Physics,Psychology,Programming,Science Hide all
Teaching Since: May 2017
Last Sign in: 188 Weeks Ago, 3 Days Ago
Questions Answered: 27237
Tutorials Posted: 27372

Education

  • MCS,MBA(IT), Pursuing PHD
    Devry University
    Sep-2004 - Aug-2010

Experience

  • Assistant Financial Analyst
    NatSteel Holdings Pte Ltd
    Aug-2007 - Jul-2017

Category > Information Systems Posted 09 Sep 2017 My Price 10.00

I need help with my homework

hw7__1_.pdf

Write a 1 page summary of the key points addressed in the talk .

due 7 hours 

more details

here is website
www.femern.com
femern_b__lt_annarbor15_summary__1_.doc
biomwb.doc

DANISH STRAIT CROSSINGS:

THE FEMERN BÆLT LINK BETWEEN DENMARK AND GERMANY

 

Mikael W Braestrup, M Sc, Ph D, Senior Engineer, RAMBOLL, Copenhagen, Denmark

e-mail: mwb@ramboll.com

 

Abstract

 

The Femern Bælt Tunnel, scheduled to open for traffic in 2021, will join Denmark and Germany by a four-lane motorway and a dual track electrified railway. With an immersed length of 17.6 km (11 miles) it will be the longest immersed tunnel in the world, as well as the longest tunnel of any kind for combined road and rail traffic. The EUR 7,400 million toll funded coast-coast crossing will be sponsored by the Danish government, Germany being responsible for the landworks on the German side only. The owner and operator will be the Danish state-owned company Femern A/S, who will finance the construction by loans guaranteed by the Danish government and paid back by road tolls and railway user fees. 

Femern Bælt Link location

The presentation will review the 20th century development of Danish strait crossings, and describe the inception, design, fabrication and installation of the Femern Bælt immersed tunnel. The construction will follow the principles successfully adopted for the 3.5 km Tunnel of the Øresund Link between Copenhagen in Denmark and Malmö in Sweden, opened for traffic in 2000. A construction yard will be established to pre-fabricate 79 standard tunnel elements of length 217 m and 10 special elements, 46 m long, accommodating mechanical and electrical equipment, as well as access for maintenance.

 

Attachments:

Answers

(12)
Status NEW Posted 09 Sep 2017 02:09 PM My Price 10.00

----------- He-----------llo----------- Si-----------r/M-----------ada-----------m -----------Tha-----------nk -----------You----------- fo-----------r u-----------sin-----------g o-----------ur -----------web-----------sit-----------e a-----------nd -----------acq-----------uis-----------iti-----------on -----------of -----------my -----------pos-----------ted----------- so-----------lut-----------ion-----------. P-----------lea-----------se -----------pin-----------g m-----------e o-----------n c-----------hat----------- I -----------am -----------onl-----------ine----------- or----------- in-----------box----------- me----------- a -----------mes-----------sag-----------e I----------- wi-----------ll

Not Rated(0)